2026 fee guide

Fees of a
project manager.

How are a project manager's fees calculated? Percentage, fixed fee, time-based — a breakdown of billing methods and what is actually included in the assignment.

6-12%
Of the works cost
Full assignment
Design → handover
3
Billing methods
48 h
Quote turnaround

How are a project manager's fees calculated?

A project manager's fees are freely set and unregulated. Contrary to popular belief, there is no official scale — each professional sets their rates according to the complexity of the project, the scope of the assignment and the local market. In Savoie and Haute-Savoie, the usual range is between 6% and 12% of the works cost excl. VAT for a full assignment.

The percentage varies mainly according to three factors: the size of the project (a large budget in absolute terms is negotiated at a lower rate), the technical complexity (major renovation at altitude vs new build on the plains) and the scope of the assignment (design only, supervision only, or a full assignment from start to finish).

At Atelier NovAlp, we favour transparency: the fee structure is presented at the first meeting, and the contract details each phase with its associated percentage. No hidden costs, no unplanned extras. Discover our services or request a personalised quote.

Billing methods

Three approaches exist side by side. The choice depends on the type of project, your budget and how much certainty you want over the final cost.

Percentage of the works budget

The most common method: 6 to 12% excl. VAT of the works cost. The benefit: the project manager has a direct interest in optimising your budget (less work = lower fees). Suited to projects whose budget can be estimated upfront.

Fixed fee

A fixed amount agreed in advance for the whole assignment. Advantage: complete cost predictability. Suited to well-defined projects where the brief is settled from the outset. Risk: amendments if the scope changes.

Time-based (hourly rate)

Billing for time spent, generally between €70 and €120 excl. VAT per hour depending on experience. Suited to short or loosely defined assignments (one-off assistance, advice, expert appraisal). Less common for a full assignment.

Partial assignment

You entrust only part of the assignment: design only (3-5%), tendering (1-2%), or site supervision only (3-5%). The unit rate is higher than for a full assignment, but the total amount is lower.

Full assignment

From the sketch to handover of the works: design, permit, tendering, site supervision, handover. This is the most protective option for the client: one contract, one person responsible, continuity from start to finish.

Site supervision only

You already have your plans and your builders, but you want a professional to coordinate the works. Allow 3 to 5% of the works cost. Includes weekly visits, written reports and handover.

What a project manager costs compared with a general contractor

The question almost always comes in this form: what does a project manager cost? The figure is above — 6 to 12% of the works excluding VAT, or €70 to €120/h on a time basis for a short appointment. But a percentage means nothing until you compare it with the other way of doing things.

With project management, you sign directly with each trade contractor. The project manager designs, invites tenders, compares offers, plans, monitors the works on site and checks the interim valuations. The fee appears in plain sight, on a separate line: it is the clearest arrangement, and the one that leaves you the most say in choosing the contractors.

With a general contractor, you sign a single contract, for a single price, with a single party answerable for the result. Coordination no longer appears as a fee line: it is built into the price of the works. It is not free for all that — it is simply invisible, and that is the only real difference in how the two quotations read.

Comparing honestly. A project management fee plus the sum of the trade packages, set against a turnkey price, can only be compared on the same scope: same works, same finishes, same ancillary items — scaffolding, waste removal, service connections, making good. That is usually where the apparent gap closes, and sometimes reverses.

We offer both. We tell you which suits your project better, and we hand you the quotation in the same format either way: item by item, with what is included and what is not.

Selected projects

All projects →

What is included in the fees

A full project management assignment covers a broad scope. Here is what is always included in our fees at Atelier NovAlp: survey of the existing building and initial assessment, outline (APS) and detailed (APD) preliminary design, building permit or prior declaration (déclaration préalable) application, tender documents (DCE) with bills of quantities, comparative analysis of the quotes received, supervision of the works (DET) with weekly site visits and written reports, checking of the firms' interim payment applications, and handover of the works with a snagging list.

What is generally not included (and billed as an extra or separately): specialist technical studies (geotechnical engineer, structural engineering firm, thermal engineer for RE2020, acoustic engineer), surveyor's fees, planning taxes, and the fees of a health and safety coordinator (SPS) if required. These services are carried out by outside specialists whom we coordinate, but their fees are added to the budget.

Important: the project manager's fees are not an additional cost but an investment. Rigorous supervision prevents budget overruns (undetected defects, unapproved extra work, delays without penalties). On a €300,000 project, a project manager at 8% costs €24,000 but can save you considerably more through management, negotiation and quality control.

Project manager vs architect: cost comparison

The two are often confused. An architect (DPLG/HMONP) registered with the Ordre generally charges between 8% and 15% of the works cost for a full assignment. Their fees are higher because their legal liability is governed by law (mandatory use for buildings over 150 m²) and their training is longer (5 to 6 years). They bring strong added value on architectural design and complex projects.

A non-architect project manager (engineering firm, general contractor acting as project manager) charges between 6% and 12%. They often work on renovation, extension or standardised new-build projects where the architectural dimension is less critical than technical coordination and site supervision.

Atelier NovAlp combines both approaches: architectural design and construction-phase project management under a single contract. This integration allows us to offer competitive fees (no double billing for design and supervision) while guaranteeing consistency from start to finish. To find out more, read our article Architect, project manager or builder: how to choose.

Areas we cover — Project management

We provide project management across Savoie and Haute-Savoie and beyond.

Frequently asked questions — Project manager fees

What is the fee range for a project manager in 2026?
Fees generally represent between 6% and 12% of the works cost excl. VAT for a full assignment (design + site supervision). The exact percentage depends on the complexity of the project, the floor area, the type of work (new build or renovation) and the level of finish. For a €300,000 project, allow between €18,000 and €36,000 excl. VAT in fees.
Are fees negotiable?
Fees are freely set and unregulated. Negotiation is possible, particularly on large budgets or partial assignments. However, fees that are too low should ring alarm bells: they may mean inadequate site supervision or infrequent visits, leading to defects that are not detected in time. The right criterion is not the lowest rate but the value for money of the service.
What is included in the fees?
A full assignment includes: survey of the existing building, outline and detailed preliminary design, building permit application, tender documents for the trades, analysis of quotes, supervision of the works (weekly visits, written reports), checking of interim payment applications, and handover of the works with a snagging list. Technical studies (geotechnical, structural, thermal) are generally billed separately.
When do you pay the project manager?
Payment is staged by phase: a deposit on signing (10 to 15%), then payment requests at each milestone (sketch approved, permit submitted, tendering launched, start of works). The balance is paid on handover of the works. This progressive payment ensures the project manager stays committed until the end of the project.
Are fees subject to VAT?
Yes, fees are subject to VAT at 20% (the standard rate for professional services). Even if the works qualify for reduced VAT at 5.5% or 10% (renovation of a home more than 2 years old), the project manager's fees remain at 20%. On a project with 8% fees and €300,000 of works, fees come to €24,000 excl. VAT, or €28,800 incl. VAT.
What does a project manager cost?
Between 6 and 12% of the works excluding VAT, depending on the scope of the appointment and the size of the project, or €70 to €120/h on a time basis for a short appointment. The percentage falls as the value of the works rises. With a general contractor, that coordination is not invoiced separately: it is built into the price of the works, which does not make it free, only invisible on the quotation.
Do you need to sign a contract with the project manager?
Yes, a written contract is essential. It must specify the scope of the assignment, the fees and how they are calculated, the payment schedule, insurance (professional liability and 10-year structural guarantee (garantie décennale)), timeframes and termination conditions. A clear contract protects both parties and prevents any dispute over the actual scope of the assignment.