Savoie & Haute-Savoie · Budget

Sarking price
per m².

Searching for a price per square metre for sarking gives baffling differences from one website to the next. The reason is simple: what people call “the price of sarking” rarely covers the same items. Here is what a quote really contains, and what can make it vary twofold.

6
Items that make up the quote
RGE
Grants conditional on certification
0 €
Cost of the first meeting
48 h
Response time to your enquiry

Why prices displayed online are misleading

Sarking — or external roof insulation — is priced per square metre, but that price per square metre only makes sense if you specify what it includes. Some estimates only cover supplying and installing the insulation system. Others include stripping the old roof covering, the new covering, scaffolding, metal roofwork and repairs to special details — a scope three to four times wider.

This is the first thing to check when you compare two quotes: when the scope differs, the comparison is worthless. A seemingly cheaper quote that excludes scaffolding and verge repairs is no longer cheaper once those lines are added back.

Rather than give you a figure that would not match your roof, we prefer to set out what really makes up the budget — and what makes it vary.

The six items in a sarking quote

1. Scaffolding and site protection. This depends on height, accessibility and the layout of the plot. On sloping ground or with restricted access, this item climbs quickly.

2. Stripping the existing roof covering, and removing the materials. This varies with the material in place and whether any materials require special treatment.

3. The insulation system itself: supporting boards, vapour barrier, insulation, roofing underlay, counter-battens and battens. This is where the choice of insulation and its thickness weighs most — the target performance is paid for directly in euros per square metre.

4. The new roof covering. Tile, slate or zinc: the difference between these materials is considerable, and it is often the first factor of variation from one quote to another.

5. Repairs to special details: verges, eaves, chimney stacks, roof windows, overhangs. The extra height created by sarking means they have to be dealt with; this item is regularly underestimated in the cheapest quotes.

6. Metal roofwork: gutters, box gutters, valleys and flashings, to be redone to match the new roof thickness.

What can make the budget vary twofold

The condition of the roof structure is the first source of uncertainty. If the timbers are sound, we build on top. If rafters need replacing, sections need strengthening or a damaged purlin needs repairing, the budget changes in nature. That is why we carry out a survey before pricing, not the other way round.

The geometry of the roof comes next. A simple pitched roof with no dormers or valleys can be dealt with efficiently. Add more offsets, dormers, valleys and chimneys, and the labour time on special details can exceed that of the plain areas.

The target performance, finally. Aiming for the regulatory minimum or aiming for the level required to unlock grants does not lead to the same insulation thickness — nor the same price. This last point deserves a calculation rather than a reflex: a greater thickness that unlocks a grant can cost less net than a thinner one without a grant.

Grants, and why sarking is more cost-effective than it seems

Our RGE CertiRénov certification (no. CR-2026-73-0095) is the condition for access to MaPrimeRénov', energy savings certificates and the zero-interest eco-loan for insulation work. The amount depends on your income, the performance achieved and the rates in force. These schemes change frequently: we check the conditions that apply at the time of your project, and we invite you to cross-check them on france-renov.gouv.fr before finalising your financing plan.

The real cost-effectiveness calculation is not “how much does sarking cost”, but “how much does sarking cost on top of a re-roofing job I have to do anyway”. Put that way, the question changes radically: the scaffolding, stripping and new covering are already in the budget. The real extra cost comes down to the insulation system and its installation — to which the grants apply.

That is exactly why we tell all our clients the same thing: if your roof needs redoing within five years, now is the time to decide to insulate. Redoing a roof covering and then wanting to insulate three years later means paying twice for scaffolding and stripping.

Our projects around the lake

All projects →

Our office is in Aix-les-Bains and we work across Savoie and Haute-Savoie. Here are some recent projects.

How we arrive at a price

A visit, a survey, a detailed quote item by item — with no catch-all lines.

Visit and survey

We go up and look: condition of the covering and the roof structure, geometry, access, special details. A price cannot be given over the phone.

Roof structure survey

The question that can make the budget vary twofold. We deal with it before pricing, not during the works.

Detailed quote

Each item priced separately: scaffolding, stripping, insulation system, covering, special details, metal roofwork. Comparable line by line.

Grant simulation

Estimate of MaPrimeRénov', CEE and the eco-PTZ based on your situation and the rates in force.

Performance/budget trade-off

We compare several thicknesses and materials to find the point where the net cost, after grants, is most favourable.

Price commitment

As general contractor, we commit to price and timescale: it is the preliminary survey that makes this commitment achievable.

Where we provide quotes

From our Aix-les-Bains office, across Savoie and Haute-Savoie.

Frequently asked questions · Sarking prices

What is the price of sarking per m²?
There is no single price, and be wary of anyone who quotes one without having seen your roof. The budget depends on six items — scaffolding, stripping, insulation system, new roof covering, special details, metal roofwork — and above all on the condition of the roof structure and the geometry of the roof. We draw up a detailed quote after a visit, free of charge.
Why do prices vary so much from one quote to another?
Because the scope being priced differs. Some quotes only cover the insulation system, others include the new roof covering, scaffolding and verge repairs. When the scope differs, the comparison is worthless: first check what each line covers.
Does sarking cost more than internal insulation?
In absolute terms, yes, because it means removing the roof covering. But an honest comparison looks at the extra cost: if your roof needs redoing anyway, the scaffolding, stripping and covering are already in the budget, and the extra cost is limited to the insulation system.
What grants can I get?
Roof insulation qualifies for MaPrimeRénov', energy savings certificates and the zero-interest eco-loan, provided you use an RGE-certified firm and meet the technical criteria. We are RGE CertiRénov certified (no. CR-2026-73-0095). The rates change often: check the conditions on france-renov.gouv.fr at the time of your project.
Can the condition of my roof structure blow the budget?
It is the main source of uncertainty, yes. Replacing rafters or repairing a damaged purlin changes the nature of the project. That is exactly why we survey the roof structure before pricing: a quote drawn up without this survey commits no one.
Do you charge for the quote?
No. The visit, the survey and the detailed quote are free and with no obligation. We will also tell you frankly if sarking is not the right solution for your roof — for example with unconverted lofts, where blown insulation costs far less.
Need a price?

A detailed quote,
item by item.

Free visit, roof structure survey and quote: you will know what you are paying for, line by line, and what the grants cover.