Savoie & Haute-Savoie · Extensions

Adding a storey
to your house.

When the plot is full, the PLU forbids extending at ground level or you refuse to sacrifice the garden, there is one direction left: up. Adding a storey creates a floor without using a single square metre of the plot — provided what is already there can carry it.

0 m²
Of land used
2
Preliminary checks: structure and PLU
150 m²
Threshold for a mandatory architect
48 h
Response time to your enquiry

When adding a storey becomes the right answer

The most common case is a constrained plot: a small site, footprint already used, setbacks required by the PLU that prevent extending towards the boundaries. Adding a storey uses no land and does not affect footprint rules.

Second case: planning rules block an extension. The ground coverage ratio has been reached, the area limits sprawl, or ground-level buildability is restricted. Going vertical is then the only direction available — provided the maximum permitted height allows it.

Third, more personal case: you don't want to sacrifice the garden. A single-storey extension takes away terrace space and ground-floor light, and often the best-oriented part of the plot. Adding a storey leaves all that intact — and offers views as a bonus, which is no small thing in Savoie.

The question that decides everything: will it carry the load?

Adding a storey places a permanent load on a building that was not necessarily designed to take it. Three elements must be checked first: the existing foundations, load-bearing walls and floors.

On a recent concrete-block or concrete building, the margin is often sufficient. On older stone buildings, very common in Savoie, the answer cannot be guessed: foundations are sometimes shallow, masonry uneven, and the real condition only becomes clear after investigative surveys. This study is not an administrative formality — it determines whether the project is feasible at all, and sometimes its final cost.

That is why we carry out this assessment before pricing, not the other way round. A quote for adding a storey drawn up without a structural study commits no one, and is always revised in the wrong direction.

Timber frame: often the most appropriate technical answer

When adding a storey, weight is not a detail: it is the main constraint. A timber-frame structure weighs a fraction of equivalent masonry, which reduces the load transferred to the existing walls and foundations accordingly. In many cases, this is what makes the project feasible where concrete would have ruled it out.

It brings two other advantages on this type of project. Prefabrication in the workshop greatly shortens the time the house is left open — a decisive point when you are still living there. And timber frame builds the insulation into the thickness of the wall, giving good thermal performance without extra thickness.

It is not a universal answer: the choice depends on the existing structure, the architecture, the PLU and the budget. But when adding a storey in Savoie, it is very often the solution that makes the most technical sense.

The PLU, height and the 150 m² threshold

Your town's local plan (PLU) sets a maximum height. It is the first document to consult, even before the structural study: if the permitted height does not allow the extra floor, the project stops there. It also governs appearance — roof pitch, materials, colours — and the new storey must remain consistent with the existing building and the neighbourhood.

Adding a storey creates floor area and changes the external appearance: a building permit is therefore required in the vast majority of cases. And as with loft conversions, using an architect registered with the Ordre des architectes becomes mandatory above 150 m² of total floor area after the work — a threshold that adding a storey almost always crosses.

We handle reading the PLU, the feasibility study, preparing the permit and following its processing, then coordination of the trades through to handover — under a project management contract or as general contractor with a committed price and timescale.

Our projects around the lake

All projects →

Our office is in Aix-les-Bains and we work across Savoie and Haute-Savoie. Here are some recent projects.

Our storey addition services

Feasibility first — structure and PLU — then the design.

Reading the local plan (PLU)

Maximum permitted height, appearance rules, area-specific constraints. This is the very first filter, even before surveying the structure.

Structural study

Existing foundations, load-bearing walls and floors: can they take the load? On older stone buildings, this cannot be guessed.

Architectural design

Integrating the new floor with the existing building, treatment of facades and roof, bringing in light and organising the volumes.

Timber-frame structure

Lightness, prefabrication and built-in insulation: often what makes adding a storey feasible where masonry would rule it out.

Building permit

Preparing the application, drawings, integration statement and following the process through to approval.

Turnkey delivery

Coordination of all the trades through to handover, with a price and timescale commitment as general contractor.

Where we work

From our Aix-les-Bains office, across Savoie and Haute-Savoie.

Frequently asked questions · Adding a storey to a house

Can every house have a storey added?
No. Two conditions must be met: the local plan (PLU) must allow the extra height, and the existing structure — foundations, load-bearing walls, floors — must be able to take the load. On older stone buildings, the second question cannot be guessed and requires investigative surveys.
Do I need a building permit?
In the vast majority of cases, yes: adding a storey creates floor area and changes the external appearance. We prepare the application and follow its processing.
Why timber frame for adding a storey?
Because weight is the main constraint. A timber frame weighs a fraction of equivalent masonry, which reduces the load transferred to the existing building and often makes a project feasible that concrete would have ruled out. It can be prefabricated, which shortens the time the house is left open.
Can you live in the house during the work?
It is common, but it depends on the phasing and scope of the work. The critical period is when the roof has been removed. Prefabricated timber frame significantly shortens this period — a criterion to build in from the design stage.
Adding a storey or extending: which to choose?
A ground-level extension is technically simpler but uses up land and often runs up against the permitted footprint. Adding a storey uses no land but requires the structure to carry it and the PLU to allow the height. We study both and give you an honest comparison.
Do you carry out the work yourselves?
Yes. We carry out the works with our own teams, who know our standards. A single point of contact from start to finish.
Do you work as project manager or on a turnkey basis?
Both. With project management, you keep control of your contracts with the firms and we coordinate. As general contractor, you have a single contract, with a committed price and timeframe.
A floor to gain?

Let's see if
it will carry it.

First meeting free and with no obligation: reading the PLU and examining the structure before any pricing.